Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the simple-custom-post-order domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /htdocs/wp-includes/functions.php on line 6114
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the woocommerce domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /htdocs/wp-includes/functions.php on line 6114
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /htdocs/wp-includes/functions.php on line 6114 Divers - ACTM
Terrassement du siège social de la société d’une superficie de 5000
ECT ALU WELD P/C COSIDER CANALISATION
Confection de 50 remorques pour groupe de soudage MILLER + 16 cabines de
soudages
COSIDER
Travaux de fourniture et pose complexe isolant et étanche pour la couverture des extensions FLA13
BATICIC-SPE ADRAR
Etude, Fourniture, Installation et mise en service d’un système anti-incendie, Instrumentation, systéme detéction dont le site est situé à la centrale d’adrar
BATICIC-SPE ADRAR
Etude, Fourniture, Installation et mise en service d’un système anti-incendie, Instrumentation, systéme detéction dont le site est situé à la centrale d’adrar
IGBS (usine de bitume)
Mise en service de 10 débitmètres (massique, electromagnétiaue)
MDN
Prestation de maintenance sur un dépôt carburant (électricité; instrumentation)
PRODIS
prestation de montage des vannes déluge avec mise en service (SPE HAMMA)
MDN
Fourniture et installation d’un système d’extraction des gaz dépôt carburant (électricité; instrumentation)
Promotion immobilière
Etude d’un systéme de protection incendie et désenfumage d’un bâtiment à usage de bureau (RDC+14 étage et 04 sous sol) STATION DE DESSALEMENT (HONAIN)-GASS
Prestation d’analyse vibratoire des pompes avec l’étude de stress piping EDEN (usine de glace)
Etude, fourniture, installation et mise en service d’un système de détection et d’extinction incendie
Begerat monnoyeur-ENERIA
Installation de deux groupes électrogène Hybride (gaz-gasoil) pour le client pour le client AMAR BEN
AMMAR (CAB),